黄色一级大片视频-黄色一级毛片看一级毛片-黄色一级毛片网站-黄色一级毛片在线观看-免费国产h视频在线观看-免费黄色大片视频

Location:Home  > News information > Industry news > 正文
Contact

Dongguan Baoding Precision Instrument Co. Ltd.

Miss.Cai  13717346368

Telephone: 0769-85588096
Fax: 0769-82688299
Email: 13717346368@163.com
URL: www.www.chinaenglish.net
Address: No. nine Park Avenue, Houjie Town, Guangdong, Dongguan, China, No. 23

Vulcanizing machine vulcanizing machine commonly used maintenance and maintenance

2017-03-13 17:01:30 Hits:2452
1 vulcanizing machine use, must read in detail the "manual", and in the installation, operation process is in accordance with the procedures specified in the instructions.
2 upper and lower electric heating board, control box, is a variety of electrical components and a variety of electrical instruments connected by wire. Therefore, in the process of handling or use, we must take light, handle, to prevent the strong vibration and heavy rub.
3 vulcanizer before use, must check the electric heating element inside the panel whether damp without affecting the insulation, otherwise they should be dry; the fastening screw nut is loose, Ali device but the penetration of water Water Leakage, otherwise should be tightened; each switch and electric control box of the instrument is not flexible and reliable.
4 in the open air to be vulcanized glue, we should pay attention to wind, rain. After use, to use wood mat, and is the cover tarpaulin, to prevent damp and water damage.
5 vulcanizer when not in use, should be put in the air circulation, relative humidity is less than 85%, not by rain and snow invasion of the Treasury; when placed, and wood mat, is placed directly on the ground.
6 long time without vulcanization, the use of before and after the upper and lower electric heating plate cover open, and the internal drying and then use; in addition, the pressure device to tighten the screws, nuts tightened.