Analysis of the operation specification of mixer
2017-03-31 10:57:57
Hits:2632
1 in the first week of production, the fastening bolt of each part of the machine should be screwed at any time, and then the screw should be tightened once a month.
2 in low temperature, in order to prevent the pipeline from freezing, the cooling water should be removed from the cooling pipe of the machine, and the compressed air will be used to clean the cooling water pipe.
3 according to the load test run the last car when the material requirements of downtime. After the main motor is shut down, turn off the lubricating motor and hydraulic motor, cut off the power supply, turn off the gas source and the cooling water source.
When the 4 ram machine in the upper position, the discharge door is in the closed position and rotor rotation in the case, can open the door to the feeding chamber.
5 when the mixer in the mixing process for some reason temporary parking, in the troubleshooting, must be close to the inside of the glue to discharge the main motor.
6 the density of the mixing chamber shall not exceed the design capacity, the full load operation of the current generally does not exceed the rated current, instantaneous overload current is generally 1.2 to 1.5 times the rated current, overload time is not greater than lOs.
7 large mixer, when feeding on the rubber block quality should not exceed 20kg, when the Plasticating rubber block temperature at 30 degrees and above.